Skip to content

Product Brochures English:

Project Syntropy Portfolio

Flyer Simulation & Training

Project Syntropy XR-Brochure

SYNtouch RADAR Product Sheet

360 Balloon Fly Adventure

flyDOME product sheet

Interactive Dome product sheet

Interactive Race Tunnel Product

Virtual Aquarium Product Sheet

Interactive Immersive Fulldome

PS – Media Based Attractions

Multitouch Globe Product Sheet

Simulation+Training/XR/CAVE Ref.

Airbus H145 ADAC HeliSim

Airbus H145 LH LAT HeliSim

Airbus H145 NCCH HeliSim

Airbus H125 REGA HeliSim

BARCO CANVAS CAVE Inizia

BMW HF and HD Driving Simulators

Daimler MBS Driving Simulator

Dallara Driving Simulators

DFS ATM Tower Simulator

DLR Dynamic Driving Simulator

DLR Braunschweig VR-Lab

DLR AVES Motion Base FlightSim

DLR AVES Fixed Base FlightSim

DLR ISTAR Fixed Base FlightSim

DLR ATM Tower-Simulator

DrillSIM:6000 MAERSK

EUROFIGHTER ASTA FMS

EUROFIGHTER PSTS FMS Laage

Fraunhofer IFF Elbe-Dome 2.0

German Air Force FPS-H HeliSim

German Army JFST Trainer

PennState Rotorcraft Flight SIM

Pilatus PC-7 MKX FTD-SIM

Renault ROADS Driving Simulator

RS Flight Systems FNPT / FTD

Ships-Sim Sikkerhetssenteret

Ships-Sim Sjöfartsverket

Target Simulation Dome WTD81

Toronto Rehab iDAPT DriverLab

Toronto Rehab CEAL StreetLab

TU Braunschweig ICG Dome

TU Munich ROSIE HeliSim

XR-LAB 3D CAVE Univ. Iserlohn

XR-CAVE HSIM Facility of HTX Agency

Media-B. Attractions + Fulldome:

4D Planetarium Gimcheon

ATICA Paris Immersive Restaurant

BASF Visitor Centre

Blanker Hans Buesum eng.

DYNAMIKUM Science Centre

EXPO 2005 Aichi Dark Ride

EXPO2012 Pavilion Korea

EXPO2012 Malaysia-Pavilion

Hengdian Qin Palace Flying Theatre

Luxlait Vitarium Science Centre

Mercury Towers Malta Flying Theatre

MUSEION Bolzano Media Facade

REGIONEUM Visitor Centre

Schloss Hessen Multimedia Center

Hunting Museum Schloss Stainz

SUPEC DSM Digital Twin

UNSW Sidney 4k DomeLab

VIRTUALITY Science Centre Riyadh

VW GMD Event Area

Winner AV 5m Fulldome

中文产品手册:

Project Syntropy 作品集

Project Syntropy XR 产品组合

SYNtouch RADAR 产品宣传册

flyDOME 产品宣传册

互动竞速隧道产品宣传册

“虚拟水族馆”产品宣传册

沉浸式穹顶产品宣传册

模拟与培训产品宣传册

弗劳恩霍夫Elbe-Dome 2 产品宣传册

布伦瑞克工业大学 ICG Dome

XR-CAVE HSIM 设施 HTX 产品宣传册

XR-LAB 3D CAVE FH SWF 伊瑟隆

DYNAMIKUM 皮尔马森斯 产品宣传册

SUPEC 上海分部产品宣传册

金泉4D天文馆 产品宣传册

ATICA沉浸式餐厅产品宣传册

布苏姆风暴潮世界产品宣传册

2005年爱知世博会黑暗骑乘项目

2012年世博会韩国馆产品宣传册

2012年世博会马来西亚馆

横店秦宫飞天剧场产品宣传册

马耳他水星大厦飞行剧院产品宣传册

博岑MUSEION媒体幕墙产品宣传册

黑森宫多媒体产品宣传册

悉尼新南威尔士大学 4K DomeLab

VIRTUALITY 科学中心 利雅得

大众汽车GMD活动专区产品宣传册

Winner AV 全穹顶产品宣传册

多媒体娱乐项目产品宣传册